Labour Rates & Work Charges (India)
Current labour rates and work charges for Indian construction — plumbing, electrical, tiling, waterproofing, building work, borewell drilling and more.
Labour Bill — what the work costs, trade by trade
Built from the rate bands published on this site, adjusted for your city
Rate × 0.95 — local wage market
Structure + masonry + plaster
₹18–30/sq ft
₹18–30/sq ft
₹90–140/sq ft
Cost now versus cost per year — the cheap one is rarely cheapest
Total labour
₹5.7 Lakh
1,500 sq ft · Other tier-2 city · Grey shell · ₹380/sq ft of built-up area
1,500 sq ft built-up × ₹299/sq ft · published band ₹280–350 ×0.95 · Structure + masonry + plaster · rates
1,500 sq ft built-up × ₹48/sq ft · published band ₹35–65 ×0.95 · Full house, labour only — pipe and fittings extra · rates
1,500 sq ft built-up × ₹33/sq ft · published band ₹25–45 ×0.95 · Conduit + wiring + fitting, labour only · rates
Your area, city, scope and every add-on are in the address bar — bookmark it, or send the link to your contractor and argue about the same numbers.
Labour only — no materials, no contractor margin. Pair it with the material bill for the other half. And treat a quote far below these bands as a question, not a saving: the gang is smaller, the programme is longer, or the claim arrives later.
Trade labour rates
5What masons, plumbers, electricians and tilers charge.
Building Work Labour Rate — With Material & Labour-Only (India)
Building construction labour rates: ₹280–₹450 per sq ft labour-only contract, mason ₹800–₹1,200/day, helper ₹500–₹700/day. Item-wise rates for RCC, masonry, plaster and shuttering.
ReadPlumbing Work Rate — Per Point, Per Bathroom & Per Sq Ft (India)
Plumbing work rates in India: ₹700–₹1,500 per point labour, ₹9,000–₹22,000 per bathroom, ₹35–₹65 per sq ft for full house. Point-wise chart for CPVC, UPVC and drainage work.
ReadElectrical Work Charges — Per Point & Per Sq Ft Rates (India)
Electrical work charges in India: ₹350–₹700 per point labour, ₹90–₹200 per sq ft with material. Point-wise rate chart for wiring, switchboards, DB, fan, AC points and full-house estimates.
ReadElectrician Service Charges — Visit, Per Point & Job Rates (India)
Electrician charges in India: ₹200–₹500 visit charge, fan installation ₹150–₹400, switchboard repair ₹100–₹300, inverter fitting ₹500–₹1,500. Full job-wise rate list.
ReadTiling & Flooring Labour Charges Per Sq Ft (India)
Tile laying labour charges: floor tiles ₹18–₹30/sq ft, wall tiles ₹25–₹40/sq ft, large format ₹35–₹60/sq ft, marble ₹40–₹80/sq ft. Complete labour rate chart with what's included.
Read
Work & item costs
3Complete costs for specific jobs.
Waterproofing Cost Per Sq Ft — Terrace, Bathroom, Tank (India)
Waterproofing cost in India: terrace ₹45–₹180/sq ft, bathroom ₹40–₹120/sq ft, water tank ₹50–₹150/sq ft, by method — brush coating, membrane, crystalline and injection grouting.
ReadFlooring Tiles Cost Per Sq Ft — Vitrified, Ceramic, Marble, Granite (India)
Flooring tiles cost in India: ceramic ₹30–₹60/sq ft, vitrified ₹45–₹150/sq ft, marble ₹80–₹400/sq ft, granite ₹70–₹250/sq ft. Material + laying cost with total installed price.
ReadBorewell Cost — Drilling Rate Per Foot & Total Cost (India)
Borewell cost in India: drilling ₹80–₹150 per foot (4.5–6.5 inch), casing ₹180–₹450 per foot, total ₹60,000–₹2 lakh for a typical 300–600 ft domestic borewell with pump.
Read
Project-level costs
4Whole-building budgets and breakups.
Construction Cost Breakup — Material & Labour Percentage (India)
House construction cost breakup: structure 55–60%, finishing 30–35%, services 10–15%. Detailed item-wise percentages for cement, steel, labour, flooring, with a worked 1,000 sq ft example.
ReadConstruction Cost of Building — Per Sq Ft Rates & Full Estimate (India)
Building construction cost in India: ₹1,700–₹2,500 per sq ft for houses, ₹2,200–₹3,500 for apartments/commercial. Stage-wise estimate method, city variation and G+1/G+2 examples.
ReadSteel Beam House Construction Cost — Steel Frame vs RCC (India)
Steel beam/frame house construction costs ₹2,200–₹3,200 per sq ft in India vs ₹1,700–₹2,500 for RCC. Where steel structure wins, ISMB rates, speed advantage and when to choose it.
ReadConstruction Cost of One Column — Material + Labour Breakdown
One RCC column (230×300mm, 3m) costs ₹6,500–₹9,500 including footing share: concrete ₹1,600, steel ₹3,200, shuttering ₹900, labour ₹1,400. Full worked breakdown per column.
Read