Construction Quality Checklists
Printable site checklists — plastering work, beam and column shuttering, plumbing work — so nothing gets missed before the next stage starts.
Build your site QC pack
Tick the stages you are signing off, and the checklists combine into one pack you can tick off, share as a link, and hand across as a single dated PDF.
Beam & column shuttering checklist
Full pageColumn shuttering
Beam & slab shuttering
During and after the pour
Ticks are saved on this device only — nothing is uploaded. The share link carries the ticks in the URL itself, so a pack you send shows exactly what you signed off. Edit any of these checklists later and old links tell the reader they are stale rather than showing the wrong ticks.
Checklist for Plastering Work — Before, During & After (Printable)
Complete plastering work checklist: surface prep, mortar mix 1:4/1:6, thickness 12-20 mm, level tolerance, curing 7 days. Point-by-point QC checklist used by site engineers.
ReadPlumbing Work Checklist — Before Tiling, Testing & Handover
Complete plumbing checklist: layout verification, CPVC/UPVC pipe checks, 24-hour pressure test at 7 kg/cm², slope checks for drainage, fixture installation and handover tests.
ReadChecklist for Beam and Column Shuttering — Before Casting
Beam and column shuttering checklist: alignment, plumb, props at 1.2m, oiling, gaps sealed, cover blocks, stripping times (sides 24-48hr, slab 14 days, cantilever 28 days).
ReadPlastering Checklist — Quick Site Card (10 Checks)
The 10-point plastering checklist to carry on site: curing, mesh at chases, mix ratio, level dots, thickness, pressing, grooves, tap test, tolerances and 7-day curing.
Read